Sale!

Complete Builders Pack – 159 x SWMS’s / Estimating & Costing Guide / Productivity Guide / QA Checklists / Auto-Schedule / WHS Management Plan

(13 customer reviews)

Original price was: $5,248.00.Current price is: $499.00.

The SAFE RITE “Builders Pack” is the ultimate all-in-one resource for Australian builders, contractors, and tradies. This comprehensive pack includes:

  • 420-page Estimating Guide
  • Residential Construction Productivity Guide for Trades
  • Trade Defects Prevention (QA) Checklists
  • 159 x ready-to-use Safe Work Method Statements (SWMS)
  • 16 x High Risk Work generic SWMS templates
  • WHS Management Plan

*Includes FREE BONUS Project Auto-Schedule (excel.doc)

 

The SAFE RITE Builders Pack was designed to be a ready-to-use and easy-to-use system to help plan, estimate, schedule, assure quality and maintain a safe & profitable project / worksite. It is a must-have toolkit for professionals who want to build smarter, safer, and more profitably.

 

1, NSW RESIDENTIAL CONSTRUCTION - ESTIMATING GUIDE (427 pages)

  • Up-to-date 2025 trade rates, labour, and material costs

  • 42 chapters covering every major trade in residential building

  • Detailed scope of works for each chapter for easy ‘up/down scaling’ to suit individual projects.
  • Explanatory notes for all cost items

  • Chapter-end validations to support accurate estimation

  • Designed for real-world use, both on-site and in the office

  • easy-to-use table format
  • designed to assist professional builders, trades, DIY's, owner builders and students

 

2. PRODUCTIVITY GUIDE - RESIDENTIAL CONTRUCTION (99 pages)

  • Labour productivity guide for over 30 key trades / tasks (per 1 x worker)

  • m2 per hour
  • m3 per hour
  • Linear metres per hour
  • Hours per unit
  • Productivity rates/time frames based on realistic site conditions

  • Optimise planning, scheduling, measuring productivity, material procurement & profits

 

3. SWMS CATALOGUE:

1. SWMS 2501 Site Setup
2. SWMS 2501.1 COVID - Working around others
3. SWMS 2501.2 Hazardous Substances and Chemical Use
4. SWMS 25101 Air Conditioning Installation - Ducted
5. SWMS 25102 Air Conditioning Installation - Split System
6. SWMS 25103 Asbestos - Working Around
7. SWMS 25104 Asbestos - Removal
8. SWMS 25105 Boom Lift
9. SWMS 25105(b) Elevated Work Platform
10. SWMS 25105(c) Cherrypicker
11. SWMS 25105(d) Scissor Lift
12. SWMS 25106 Brick Cleaning
13. SWMS 25107 Brick Laying
14. SWMS 25108 Block Laying
15. SWMS 25108.1 Brick & Block Cutting Using Masonry (Brick) Saw
16. SWMS 25109 Ceiling Grid Installation
17. SWMS 25110 Cement Rendering
18. SWMS 25111 Concrete Core Drilling
19. SWMS 25112.1 Carpentry - Installing Steel Frame Sub Floor
20. SWMS 25112.2 Carpentry - Installing Timber Sub Floor
21. SWMS 25113.1 Carpentry - Installing Steel Frame walls Single Storey
22. SWMS 25113.2 Carpentry - Installing Timber Frame walls Single Storey
23. SWMS 25114.1 Carpentry - Installing Steel Frame Walls Multi Storey
24. SWMS 25114.2 Carpentry - Installing Timber Frame Walls Multi Storey
25. SWMS 25115.1 Carpentry - Installing Prefabricated Steel Walls Single Storey
26. SWMS 25115.2 Carpentry - Installing Prefabricated Timber Walls Single Storey
27. SWMS 25116.1 Carpentry - Installing Prefabricated Steel Walls Multi Storey
28. SWMS 25116.2 Carpentry - Installing Prefabricated Timber Walls Multi Storey
29. SWMS 25117.1 Carpentry - Installing Prefabricated Steel Roof Truss
30. SWMS 25117.2 Carpentry - Installing Prefabricated Timber Roof Truss
31. SWMS 25117.3 Carpentry - Installing Steel Roof Frame Cut Onsite
32. SWMS 25117.4 Carpentry - Installing Timber Roof Frame Cut Onsite
33. SWMS 25117.5 Carpentry - Work around floor penetrations and working at heights
34. SWMS 25118.1 Carpentry - Installing Fascia & Eaves Soffit
35. SWMS 25118.2 Carpentry - Installing windows Ground Floor
36. SWMS 25118.3 Carpentry - Installing windows Multi Storey
37. SWMS 25118.4 Carpentry - Work on Conventional Roof
38. SWMS 25118.5 Internal Stairs (Timber MDF)
39. SWMS 25118.6 Internal Stairs (Steel)
40. SWMS 25119 Concrete Pumping
41. SWMS 25120 Concreting
42. SWMS 25121 Cement Rendering
43. SWMS 25123 Mobile Plant - Articulated Hauler
44. SWMS 25124 Mobile Plant - Backhoe
45. SWMS 25126 Mobile Plant - Dumper truck
46. SWMS 25127 Mobile Plant - Earth Moving Equipment
47. SWMS 25128 Mobile Plant - Excavation & Trenching
48. SWMS 25129 Mobile Plant - Excavator
49. SWMS 25130 Mobile Plant - Front End Loader
50. SWMS 25131 Mobile Plant - Grader
51. SWMS 25133 Loading and Unloading Vehicles
52. SWMS 25134 Manual Handling
53. SWMS 25136 Mobile Plant - Mini Digger
54. SWMS 25137 Respirable Crystalline Silica (RCS) Dust Control
55. SWMS 25138 Mobile Plant - Roller Compaction
56. SWMS 25140 Mobile Plant - Skid Steer Loader
57. SWMS 25141 Traffic Management
58. SWMS 25142 Mobile Plant - Water Truck
59. SWMS 25143 Worksite Hazard Assessments
60. SWMS 25144 Cordless Power Tools
61. SWMS 25145 Mobile Plant - Truck Mounted Crane (Hiab)
62. SWMS 25145.2 Mobile Crane
63. SWMS 25145.3 Mobile Crane - Non Slewing
64. SWMS 25145.4 Mobile Crane - Vehicle Loading Crane
65. SWMS 25145.5 Mobile Cranes Up to 20 tonnes (C2)
66. SWMS 25145.6 Mobile Cranes Up to 60 Tonnes (C6)
67. SWMS 25145.7 Mobile Cranes Up to 100 Tonnes (C1)
68. SWMS 25145.8 Tower Crane (CT)
69. SWMS 25145.9 Dogging (DG)
70. SWMS 25145.10 Rigging
71. SWMS 25145.11 Erecting Scaffolding
72. SWMS 25145.12 Dismantling Scaffolding
73. SWMS 25146 Deck and Pergola - Timber
74. SWMS 25147 Demolition
75. SWMS 25148 Hoists (HM)
76. SWMS 25148.2 Personnel and Materials Hoist (HP)
77. SWMS 25149.1 Forklift (LF)
78. SWMS 25149.2 Order Picking Forklift Truck (LO)
79. SWMS 25150.1 Formwork - for Ground raft and waffle slab
80. SWMS 25150.2 Formwork - Erecting Formwork less than 2 metres high
81. SWMS 25150.3 Formwork - Erecting Formwork more than 2 metres high
82. SWMS 25151.1 Formwork - Erecting columns less than 2 metres high
83. SWMS 25152.1 Formwork - Stripping columns less than 2 metres high
84. SWMS 25152.2 Formwork - Stripping columns more than 2 metres high
85. SWMS 25153.1 Formwork - Erecting Formwork Wall Shutters
86. SWMS 25153.2 Formwork - Stripping Formwork Wall Shutters
87. SWMS 25154.1 Formwork - Erecting and stripping conventional walls
88. SWMS 25155.1 Formwork - Laying timber and plywood deck
89. SWMS 25155.2 Formwork - Working around penetrations
90. SWMS 25156.1 Steel Reinforcement - Beams
91. SWMS 25156.2 Steel Reinforcement - Slabs and decks
92. SWMS 25156.3 Steel Reinforcement - Columns and walls
93. SWMS 25156.4 Steel Reinforcement - Placing mesh for ground slab
94. SWMS 25157.1 Plumbing - Excavation ground works & connection to mains
95. SWMS 25157.2 Plumbing - Rough in
96. SWMS 25157.3 Plumbing - Fit Off
97. SWMS 25157.4 Plumbing - Installing Hot Water System
98. SWMS 25158.1 Fencing - Timber
99. SWMS 25158.2 Fencing - Metal
100. SWMS 25159.1 Glazing - Installing windows and sliding doors
101. SWMS 25160.1 Insulation - Install ceiling and wall insulation
102. SWMS 25161.1 Plasterboard - Install
103. SWMS 25161.2 Plasterboard - Dry Plastering
104. SWMS 25161.3 Wet Area wall and ceiling linings
105. SWMS 25162.1 Joinery & Cabinetry installation
106. SWMS 25163.1 Painting - Internal
107. SWMS 25163.2 Painting - External
108. SWMS 25164.1 Roof - Tiles
109. SWMS 25164.2 Roof - Metal Sheeting
110. SWMS 25164.3 Roof - Working on roofs and using fall protection
111. SWMS 25164.4 Roof - Roof Plumbing
112. SWMS 25165.1 Waterproofing - Internal
113. SWMS 25165.2 Waterproofing - External
114. SWMS 25166.1 Tiling - Internal Wet Areas
115. SWMS 25166.2 Tiling - Internal Living Areas
116. SWMS 25166.3 Tiling - External Floors and Walls
117. SWMS 25167.5 External Cladding - Polystyrene
118. SWMS 25167.6 External Cladding - Composite
119. SWMS 25167.7 External Cladding - Aluminium
120. SWMS 25167.8 External Cladding - Stone
121. SWMS 25167.9 External Cladding - Fibre Cement
122. SWMS 25167.6 External Cladding - Timber
123. SWMS 25167.7 External Cladding - Ceramic Tiles
124. SWMS 25167.8 External Cladding - uPVC (Unplasticized Polyvinyl Chloride)
125. SWMS 25167.9 External Cladding - polyvinyl chloride (PVC)
126. SWMS 25168.1 Electrical - Connect to mains
127. SWMS 25168.2 Electrical - Ground Slab
128. SWMS 25168.3 Electrical - Rough in
129. SWMS 25168.4 Electrical - Fix-in out stage
130. SWMS 25169.1 Tools Angle Grinder
131. SWMS 25169.2 Tools Arc Welder
132. SWMS 25169.3 Tools Auger Post Hole Digger
133. SWMS 25169.4 Tools Band Saw
134. SWMS 25169.5 Tools Brick Saw
135. SWMS 25169.6 Tools Chain Saw
136. SWMS 25169.7 Tools Chain Trencher
137. SWMS 25169.8 Tools Circular Saw
138. SWMS 25169.9 Tools Compressed Air Generator
139. SWMS 25169.10 Tools Concrete Grinder
140. SWMS 25169.11 Tools Concrete Mixer - Portable
141. SWMS 25169.12 Tools Concrete Saw
142. SWMS 25169.13 Tools Concrete Sealer Sprayer
143. SWMS 25169.14 Tools Disc Sander
144. SWMS 25169.15 Tools Drill Press
145. SWMS 25169.16 Tools Drop saw
146. SWMS 25169.17 Tools Electric Drill
147. SWMS 25169.18 Tools Electric Plane
148. SWMS 25169.19 Tools Explosive Power Tools
149. SWMS 25169.20 Tools High Pressure Water Cleaner
150. SWMS 25169.21 Tools Kanga or Jack Hammer
151. SWMS 25169.22 Tools Mitre Saw
152. SWMS 25169.23 Tools Panel Saw
153. SWMS 25169.24 Tools Radial Arm Saw
154. SWMS 25169.25 Tools Slide Compound Saw
155. SWMS 25169.26 Tools Wet and Dry Vacuum
156. SWMS 25169.27 Tools Nail Gun
157. SWMS 25169.28 Tools Ladder
158. SWMS 25169.29 Tools Plate Compactor
159. SWMS 25169.29 Safely Use Powered Tools

 

4. HIGH RISK WORK GENERIC SWMS:

  • HR-SWMS01 Asbestos
  • HR-SWMS02 Confined Spaces
  • HR-SWMS03 Demolition
  • HR-SWMS04 Work involves structural alteration or repair that requires temporary support to prevent collapse
  • HR-SWMS05 Traffic Control
  • HR-SWMS06 Work carried out in areas with artificial extremes of temperature
  • HR-SWMS07 Work carried out in or near water or other liquid that involves a risk of drowning
  • HR-SWMS08 Work carried out on or near chemical, fuel or refrigerant lines
  • HR-SWMS09 Work carried out on or near energised electrical installations or services
  • HR-SWMS10 Work carried out on or near pressurised gas mains or piping
  • HR-SWMS11 Work carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor in use by traffic other than pedestrians
  • HR-SWMS11 Work that involves tilt-up or precast concrete
  • HR-SWMS12 Work which involves diving
  • HR-SWMS13 Working at Heights
  • HR-SWMS14 Working at Heights – working from scaffold
  • HR-SWMS15 Working near trenches more than 1.5 m deep

 

5. QUALITY ASSURANCE (QA) CHECKLISTS:

  • Perfect for builders, supervisors, trades, trainees and apprentices to learn how do identify basic workflows and defects.
  • Lists tolerances and defects, Australian Standards, NCC/BCA.
  • Demolition

  • Excavation

  • Site Clearing

  • Formwork, Steel & Concrete

  • Timber or Metal Framing & Roof Truss

  • Bricklaying and Masonry - Visual Inspection

  • Bricklaying and Masonry

  • Electrical

  • Plumbing

  • Metal Roofing

  • Roof Plumbing

  • Painting

  • Floor & Wall Tiling

  • Plasterboard & Internal Fixing

  • Wet Areas

 

6. WHS MANAGEMENT PLAN:

  • 79 Page WHS Plan
  • Site Policies
  • Site Procedures
  • Safety checklists
  • Safety registers
  • Safe work Method Statement (SWMS) software
  • more…

13 reviews for Complete Builders Pack – 159 x SWMS’s / Estimating & Costing Guide / Productivity Guide / QA Checklists / Auto-Schedule / WHS Management Plan

  1. Nathan Ricci

    Just dowloaded the catalogue. Estimating is better the Rawlisons and Procore. SWMS are first class. Productivity guide was a great bonus

    • SAFE RITE

      Thanks Nathan!

  2. Steven S.

    Thanks for all your help today Tom, This is exactly what I needed.

    • SAFE RITE

      Pleasure Steve. Best of luck with the new business!

  3. Steve Wilson

    The estimating guide is probably one of the most comprehensive and most professionally researched currently on the market. Congratulations team.

  4. M. Ali Saad

    Arguably one of the most in depth and highest quality resources available to builders and trades. The research for the Estimating Guide and Productivity Guide is thorough and probably the best I have ever seen. Great job Tommy!

  5. Katie G.

    Awesome. Thank you Tommy!

  6. Sam Elshabi

    Thanks Tommy. Saves me alot of time writing the SWMS. QA Checklists are brilliant.

    • SAFE RITE

      No worries Sam. Best of luck mate.

  7. Ben Hodges

    Very impressed with the estimating guide and SWMS pack. Thanks Tommy

  8. Arnold Fitzsimmonds

    I’ve been in the building industry for 40 years. This is propably the best estimating and cost guide I have seen to date, Well done Safe Rite!

  9. Nathan Bourke

    Excellent! Thanks Tommy.

  10. John Petrovic

    I just needed the SWMS pack but the rest of the resources just blew me away. Great value for money!

  11. Pete Saidi

    Very happy. Thanks Tommy!

  12. mick donaghue

    Really appreciate the time on the phone yesterday today Tommy. SWMS pack and Estimating guide were top quality. The productivity guide was exactly what I was looking for as there is nothing like this on the market. Great job!

  13. Jordan Thompsen

    Highly recommended.

Add a review

Your email address will not be published. Required fields are marked *