Sale!

Safe Work Method Statement (SWMS) Full Builders Catalogue: 159 x ready-to-use SWMS’s.

(2 customer reviews)

Original price was: $4,414.00.Current price is: $399.00.

The SAFE RITE PROFESSIONAL BUILDERS SWMS Catalogue was specifically developed for builders, contractors & trades. It outlines legal requirements, potential hazards, control measures, and step-by-step procedures to ensure worker safety and compliance with WHS regulations. (MS Word.doc)

Total Number: 159 x SWMS (see entire catalogue below)

Each SWMS includes the following:

  • Project and contractor details

  • Consultation & review
  • Description of high-risk work

  • Risk assessment matrix

  • Step-by-step tasks

  • Identifies hazards,

  • Control measures

  • Required PPE and training

  • Applicable legislation,

  • Australian Standards,

  • Codes of practice

  • Environmental hazard management

  • Worker sign-off

*Includes FREE Bonus WHS Managemet Plan (Value: $600)

*Includes 16 x FREE High Risk Work generic SWMS templates

A safe work method statement (SWMS) is a safety document that must be developed for all high risk construction work under the Work Health and Safety (WHS) Regulation 2017.

A SWMS must be site-specific and made available to all workers, supervisors, inspectors and any other person(s) at the workplace. A SWMS must identify hazards, risks and control measures that must be used to ensure worker safety.

SWMS Catalogue Includes:

1. SWMS 2501 Site Setup
2. SWMS 2501.1 COVID - Working around others
3. SWMS 2501.2 Hazardous Substances and Chemical Use
4. SWMS 25101 Air Conditioning Installation - Ducted
5. SWMS 25102 Air Conditioning Installation - Split System
6. SWMS 25103 Asbestos - Working Around
7. SWMS 25104 Asbestos - Removal
8. SWMS 25105 Boom Lift
9. SWMS 25105(b) Elevated Work Platform
10. SWMS 25105(c) Cherrypicker
11. SWMS 25105(d) Scissor Lift
12. SWMS 25106 Brick Cleaning
13. SWMS 25107 Brick Laying
14. SWMS 25108 Block Laying
15. SWMS 25108.1 Brick & Block Cutting Using Masonry (Brick) Saw
16. SWMS 25109 Ceiling Grid Installation
17. SWMS 25110 Cement Rendering
18. SWMS 25111 Concrete Core Drilling
19. SWMS 25112.1 Carpentry - Installing Steel Frame Sub Floor
20. SWMS 25112.2 Carpentry - Installing Timber Sub Floor
21. SWMS 25113.1 Carpentry - Installing Steel Frame walls Single Storey
22. SWMS 25113.2 Carpentry - Installing Timber Frame walls Single Storey
23. SWMS 25114.1 Carpentry - Installing Steel Frame Walls Multi Storey
24. SWMS 25114.2 Carpentry - Installing Timber Frame Walls Multi Storey
25. SWMS 25115.1 Carpentry - Installing Prefabricated Steel Walls Single Storey
26. SWMS 25115.2 Carpentry - Installing Prefabricated Timber Walls Single Storey
27. SWMS 25116.1 Carpentry - Installing Prefabricated Steel Walls Multi Storey
28. SWMS 25116.2 Carpentry - Installing Prefabricated Timber Walls Multi Storey
29. SWMS 25117.1 Carpentry - Installing Prefabricated Steel Roof Truss
30. SWMS 25117.2 Carpentry - Installing Prefabricated Timber Roof Truss
31. SWMS 25117.3 Carpentry - Installing Steel Roof Frame Cut Onsite
32. SWMS 25117.4 Carpentry - Installing Timber Roof Frame Cut Onsite
33. SWMS 25117.5 Carpentry - Work around floor penetrations and working at heights
34. SWMS 25118.1 Carpentry - Installing Fascia & Eaves Soffit
35. SWMS 25118.2 Carpentry - Installing windows Ground Floor
36. SWMS 25118.3 Carpentry - Installing windows Multi Storey
37. SWMS 25118.4 Carpentry - Work on Conventional Roof
38. SWMS 25118.5 Internal Stairs (Timber MDF)
39. SWMS 25118.6 Internal Stairs (Steel)
40. SWMS 25119 Concrete Pumping
41. SWMS 25120 Concreting
42. SWMS 25121 Cement Rendering
43. SWMS 25123 Mobile Plant - Articulated Hauler
44. SWMS 25124 Mobile Plant - Backhoe
45. SWMS 25126 Mobile Plant - Dumper truck
46. SWMS 25127 Mobile Plant - Earth Moving Equipment
47. SWMS 25128 Mobile Plant - Excavation & Trenching
48. SWMS 25129 Mobile Plant - Excavator
49. SWMS 25130 Mobile Plant - Front End Loader
50. SWMS 25131 Mobile Plant - Grader
51. SWMS 25133 Loading and Unloading Vehicles
52. SWMS 25134 Manual Handling
53. SWMS 25136 Mobile Plant - Mini Digger
54. SWMS 25137 Respirable Crystalline Silica (RCS) Dust Control
55. SWMS 25138 Mobile Plant - Roller Compaction
56. SWMS 25140 Mobile Plant - Skid Steer Loader
57. SWMS 25141 Traffic Management
58. SWMS 25142 Mobile Plant - Water Truck
59. SWMS 25143 Worksite Hazard Assessments
60. SWMS 25144 Cordless Power Tools
61. SWMS 25145 Mobile Plant - Truck Mounted Crane (Hiab)
62. SWMS 25145.2 Mobile Crane
63. SWMS 25145.3 Mobile Crane - Non Slewing
64. SWMS 25145.4 Mobile Crane - Vehicle Loading Crane
65. SWMS 25145.5 Mobile Cranes Up to 20 tonnes (C2)
66. SWMS 25145.6 Mobile Cranes Up to 60 Tonnes (C6)
67. SWMS 25145.7 Mobile Cranes Up to 100 Tonnes (C1)
68. SWMS 25145.8 Tower Crane (CT)
69. SWMS 25145.9 Dogging (DG)
70. SWMS 25145.10 Rigging
71. SWMS 25145.11 Erecting Scaffolding
72. SWMS 25145.12 Dismantling Scaffolding
73. SWMS 25146 Deck and Pergola - Timber
74. SWMS 25147 Demolition
75. SWMS 25148 Hoists (HM)
76. SWMS 25148.2 Personnel and Materials Hoist (HP)
77. SWMS 25149.1 Forklift (LF)
78. SWMS 25149.2 Order Picking Forklift Truck (LO)
79. SWMS 25150.1 Formwork - for Ground raft and waffle slab
80. SWMS 25150.2 Formwork - Erecting Formwork less than 2 metres high
81. SWMS 25150.3 Formwork - Erecting Formwork more than 2 metres high
82. SWMS 25151.1 Formwork - Erecting columns less than 2 metres high
83. SWMS 25152.1 Formwork - Stripping columns less than 2 metres high
84. SWMS 25152.2 Formwork - Stripping columns more than 2 metres high
85. SWMS 25153.1 Formwork - Erecting Formwork Wall Shutters
86. SWMS 25153.2 Formwork - Stripping Formwork Wall Shutters
87. SWMS 25154.1 Formwork - Erecting and stripping conventional walls
88. SWMS 25155.1 Formwork - Laying timber and plywood deck
89. SWMS 25155.2 Formwork - Working around penetrations
90. SWMS 25156.1 Steel Reinforcement - Beams
91. SWMS 25156.2 Steel Reinforcement - Slabs and decks
92. SWMS 25156.3 Steel Reinforcement - Columns and walls
93. SWMS 25156.4 Steel Reinforcement - Placing mesh for ground slab
94. SWMS 25157.1 Plumbing - Excavation ground works & connection to mains
95. SWMS 25157.2 Plumbing - Rough in
96. SWMS 25157.3 Plumbing - Fit Off
97. SWMS 25157.4 Plumbing - Installing Hot Water System
98. SWMS 25158.1 Fencing - Timber
99. SWMS 25158.2 Fencing - Metal
100. SWMS 25159.1 Glazing - Installing windows and sliding doors
101. SWMS 25160.1 Insulation - Install ceiling and wall insulation
102. SWMS 25161.1 Plasterboard - Install
103. SWMS 25161.2 Plasterboard - Dry Plastering
104. SWMS 25161.3 Wet Area wall and ceiling linings
105. SWMS 25162.1 Joinery & Cabinetry installation
106. SWMS 25163.1 Painting - Internal
107. SWMS 25163.2 Painting - External
108. SWMS 25164.1 Roof - Tiles
109. SWMS 25164.2 Roof - Metal Sheeting
110. SWMS 25164.3 Roof - Working on roofs and using fall protection
111. SWMS 25164.4 Roof - Roof Plumbing
112. SWMS 25165.1 Waterproofing - Internal
113. SWMS 25165.2 Waterproofing - External
114. SWMS 25166.1 Tiling - Internal Wet Areas
115. SWMS 25166.2 Tiling - Internal Living Areas
116. SWMS 25166.3 Tiling - External Floors and Walls
117. SWMS 25167.5 External Cladding - Polystyrene
118. SWMS 25167.6 External Cladding - Composite
119. SWMS 25167.7 External Cladding - Aluminium
120. SWMS 25167.8 External Cladding - Stone
121. SWMS 25167.9 External Cladding - Fibre Cement
122. SWMS 25167.6 External Cladding - Timber
123. SWMS 25167.7 External Cladding - Ceramic Tiles
124. SWMS 25167.8 External Cladding - uPVC (Unplasticized Polyvinyl Chloride)
125. SWMS 25167.9 External Cladding - polyvinyl chloride (PVC)
126. SWMS 25168.1 Electrical - Connect to mains
127. SWMS 25168.2 Electrical - Ground Slab
128. SWMS 25168.3 Electrical - Rough in
129. SWMS 25168.4 Electrical - Fix-in out stage
130. SWMS 25169.1 Tools Angle Grinder
131. SWMS 25169.2 Tools Arc Welder
132. SWMS 25169.3 Tools Auger Post Hole Digger
133. SWMS 25169.4 Tools Band Saw
134. SWMS 25169.5 Tools Brick Saw
135. SWMS 25169.6 Tools Chain Saw
136. SWMS 25169.7 Tools Chain Trencher
137. SWMS 25169.8 Tools Circular Saw
138. SWMS 25169.9 Tools Compressed Air Generator
139. SWMS 25169.10 Tools Concrete Grinder
140. SWMS 25169.11 Tools Concrete Mixer - Portable
141. SWMS 25169.12 Tools Concrete Saw
142. SWMS 25169.13 Tools Concrete Sealer Sprayer
143. SWMS 25169.14 Tools Disc Sander
144. SWMS 25169.15 Tools Drill Press
145. SWMS 25169.16 Tools Drop saw
146. SWMS 25169.17 Tools Electric Drill
147. SWMS 25169.18 Tools Electric Plane
148. SWMS 25169.19 Tools Explosive Power Tools
149. SWMS 25169.20 Tools High Pressure Water Cleaner
150. SWMS 25169.21 Tools Kanga or Jack Hammer
151. SWMS 25169.22 Tools Mitre Saw
152. SWMS 25169.23 Tools Panel Saw
153. SWMS 25169.24 Tools Radial Arm Saw
154. SWMS 25169.25 Tools Slide Compound Saw
155. SWMS 25169.26 Tools Wet and Dry Vacuum
156. SWMS 25169.27 Tools Nail Gun
157. SWMS 25169.28 Tools Ladder
158. SWMS 25169.29 Tools Plate Compactor
159. SWMS 25169.29 Safely Use Powered Tools

2 reviews for Safe Work Method Statement (SWMS) Full Builders Catalogue: 159 x ready-to-use SWMS’s.

  1. Alex Venko

    Thanks Tom. Perfect!

  2. vicki Nueman

    Thanks so much Tommy! 5 stars!

Add a review

Your email address will not be published. Required fields are marked *